MANILA, Philippines — The Energy Regulatory Commission (ERC) announced that it has issued the 2025 Amended Rules Enabling the Net-Metering Program for Renewable Energy.
ERC amends net-metering rules to expand renewable energy options
The regulator said this development aimed to streamline the implementation of the net-metering program and make renewable energy (RE) adoption more accessible to qualified end-users.

ERC amends net-metering rules to expand renewable energy options
Following a series of public consultations and careful review of stakeholders’ inputs, the ERC issued Resolution 15, Series of 2025, introducing key amendments aimed at strengthening consumer protection and simplifying processes for availing of the program.
As per the ERC, one of the key amendments permits the banking and rollover of net-metering credits toward a qualified end-user's electricity usage across current and future billing periods.
It added that in the event of a property ownership change, the credits may be transferred to the new owner, subject to conditions such as a conforme letter from the original owner.
Net-metering allows customers of distribution utilities to install an on-site Renewable Energy (RE) facility not exceeding 100 kilowatts (kW) in capacity so they can generate electricity for their own use., This news data comes from:http://www.xs888999.com
In turn, any electricity generated that is not consumed by the customer is automatically exported to the distribution utility's’s distribution system.
- Pope Leo meets LGBTQ+ Catholic advocate and vows continuity with Pope Francis' legacy of welcome
- COA flags fraud in P342M Bulacan flood control projects
- PTFOMS and CHR sign agreement to improve Filipino media workers' safety
- No winner in lotto draws for Aug 28
- Marcos embarks on three-day state visit to Cambodia
- PH, Australia hold live fire drills during ALON 2025 in Nueva Ecija
- Mandela grandson says he will join Gaza aid boat
- Peru’s ex-president Toledo gets a second sentence in the Odebrecht corruption scandal
- MMDA proposes rainwater facilities in Camp Aguinaldo to mitigate EDSA flooding
- India warns Pakistan of more cross-border flooding due to heavy monsoon rains